About Us     Investment




Over the last few years we have brought our level of investment up to about US $10,000,000, resulting in the following improvements:

New 40,000 m2 plant

Machinery and equipment to improve  production capacity

Among others:

-
CNC boiler tube roller
-
CNC plasma and oxygen cutting for sheet steel
-
Underwater TIG, MIG, PULSE and ARC welding machines
-
Bridge cranes for improved efficiency and worker safety
-
Granulation chamber for painting preparation and special building for enclosed painting conserving the environment
-
CNC lathes as well as a CNC centering machine for precision centering functions
-
Vertical lathe measuring 6.3m

Hardware and software :

   Investment and commitment to the ERP management tool which:

-
Optimizes engineering capability and capacity
-
Assures the timely management of works in progress
-
Maximizes operating efficiencies and production capacity
-
Enhances in-plant control systems
-
Improves information and communications management inside and out of the plant

QA/QC:

-
Quality Manual
-
Total Layout
-
Standards
-

Qualification, training and certification of personnel

-
ASME- FIMA is authorized to use ‘U’, ‘S’ and ‘R’ certifications of work performed

Welding School:

-
FIMA, in conjunction with Soldexa and the Peruvian Army, has implemented an on-site training center to create a new generation of welders equipped to meet the demands of global markets and comply with the specifications of international certifications.

 

top back